Menu

19th February, 2026

flow line

DWC: The piping that exits the bell nipple and conducts drilling fluid and cuttings to the shale shaker and drilling fluid pits.

Source: API RP 64

WIPC: The line attached to the Xmas Tree that carries well fluids into production.