The abbreviation of the term ‘blowout preventer’. A closing or shearing device used to prevent the unplanned flow of well fluids during drilling or interventions. It is located at the wellhead or Xmas Tree.
The abbreviation of the term ‘blowout preventer’. A closing or shearing device used to prevent the unplanned flow of well fluids during drilling or interventions. It is located at the wellhead or Xmas Tree.